Check out our recent projects!

Architecture

image

HOUSING CONSTRUCTION & INFRASTRUCTURE WORKS

Spanish Village Development (500 service lots and 500 for 2 and 3 bedrooms houses)
(Black Brothers Housing Development – Jamaica)

Summary of works:

The works involved the construction of infrastructure Works (water supply piping network, drainage systems, sewer lines, roads with an asphaltic concrete surface) to support the development. Additionally, the development included the construction of five hundred (500) two & three bedroom houses.

Value of Works: J$1.5 Billion

Duration: 3 years

image

HOUSING CONSTRUCTION & INFRASTRUCTURE WORKS

Denbigh Kraal Infrastructure & Housing Development Works
(Jamalco) 

Summary of works:

Denbigh Kraal (Sheckles) infrastructure and housing development, road, potable water, and storm water drainage system development. The works included the construction of thirty (30) three bedroom houses on selected lots to facilitate the relocation of community folks.

Value of Works: J$1.5 Billion

Duration: 2 years

image

HOUSING CONSTRUCTION & INFRASTRUCTURE WORKS

Twin Palms Infrastructure & Housing Development
Colglo Properties Development Company Limited

Summary of works:

The works involved the construction of infrastructure Works (water supply piping network, drainage systems, sewer systems & lines, roads with an asphaltic concrete surface) to support the development. Additionally, the development included the construction of twenty (20) four & five bedrooms multi-story houses.

Value of Works: US$3Million

Duration: 3 years

Construction

image

ROAD CONSTRUCTION & INFRASTRUCTURE WORKS

Construction of Palisadoes Revetment Works – Kingston – Jamaica
(National Works Agency)

Summary of works:

The works involved in the construction of Revetment works along approximately 5.4km of peninsular, leading the Norman Manley International Airports in Kingston, Jamaica. The works also include land reclamation & Roadbase construction, asphaltic concrete dressing, retaining walls, road curbs, and channels for approximately 5.4 km of roadways.

Value of Works: J$1.2 Billion

Duration: 1 years

image

ROAD CONSTRUCTION & INFRASTRUCTURE WORKS

Fern Gully Road Rehabilitation Works (5km) – St. Ann, Jamaica
(National Works Agency)

Summary of works:

The works involved road base construction and asphaltic concrete dressing. It also includes the construction of retaining walls, road curbs, and channels for approximately 5km of roadways.

Value of Works: J$200M

Duration: 8 months

image

ROAD CONSTRUCTION & HOUSING INFRASTRUCTURE WORKS

Melrose Sub-division Infrastructure Development Works for six hundred (600) service lots
(National Housing Development Cooperation)

Summary of works:

The works involved the construction of infrastructure Works (water supply piping network, drainage systems, sewer lines and roads with an asphaltic concrete surface) to support the 600 service lots for the housing development.

Value of Works: J$600M

Duration: 15 months

TRANSPORT SYSTEM INFRASTRUCTURE WORKS

Construction of Concrete Load Out Station Infrastructure
(Works to facilitate transportation of bauxite by train – Jamalco) 

Summary of works:

The works involved the construction of reinforced concrete works to house the mechanical and electrical structure to load and transport approximately 20,000 metric tons of bauxite daily.

Value of Works: J$80M

Duration: 8 months

image

BAUXITE MINING, TRANSPORTATION & ASSOCIATED SERVICES

Bauxite Mining, Transportation & Associated Services
(Jamalco) 

Summary of works:

The contract required the provision of all labor, tools, and equipment as necessary to effectively execute the mining and transportation of bauxite, and also the completion of associated services, such as road construction, road maintenance, and building maintenance services. The works required the consistent delivery of 5 million tons of bauxite annually at the required quality to the designated stockpiles.

Value of Works: J$5.3Billion

Duration: 5 months

Building

image

BUILDING CONSTRUCTION WORKS

Construction of Walker’s Wood Factory – St. Ann, Jamaica
(Caribbean Foods Limited)

Summary of works:

The works involved the construction of one steel and reinforced concrete building of approximately 50,000 square feet of the house, a production factory. The works also include the construction of a reinforced concrete water tank, water drainage facilitates, concrete fence, chain link fence, curbs, and channels.

Value of Works: J$600M

Duration: 14 months

Plumbing

image

WATER SUPPLY INFRASTRUCTURE WORKS

Lamb’s River & German Town Water Supply System Installation
(National Housing Development Cooperation – Jamaica)

Summary of works:

The works involved the excavation of trenches and installation of 2 miles of 6” diameter ductile iron piping and associated fittings and 200, 000 gallons of a water tank to supply potable water to the community.

Value of Works: J$50M

Duration: 6 months

image

EARTH DAM (BAUXITE RESIDUE) CONSTRUCTION & INFRASTRUCTURE WORKS

Construct Residue Disposal Area (RDA) #5 Uplift
(Jamalco)

Summary of works:

The contract required the provision of all labor, tools, and equipment as necessary to complete earth embankment for the Residue Disposal Area Uplift. The works include clearing vegetation, layout and survey controls, excavate, and transport all cut and fill material to achieve grading specifications, compacted material (1,062,200 cubic meters) to achieve designed elevations as per specifications. Construct & install associated infrastructure works.

Value of Works: J$1.6Billion

Duration: 15 months